Building Structure work Architectural drawing

PROJECT WORK Specification : All concrete mix M20. All concrete shall be machine mixed and Machine vibrated. All the dimension and detail are to be verified with the Architectural drawing. Bearing capacity of soil adopted as 15MT. Water curing should be done at least for 21 days. Footing layout plan and details Footing plan and section ⬇️  Download PDF file