Building Structure work Architectural drawing
PROJECT WORK
Specification:
All concrete mix M20.
All concrete shall be machine mixed and Machine vibrated.
All the dimension and detail are to be verified with the Architectural drawing.
Bearing capacity of soil adopted as 15MT.
Water curing should be done at least for 21 days.


Comments
Post a Comment